More MSA Articles

Call for MSA Director Nominations

The Mars Society Australia is now calling for nominations for its Board of Directors in its partial annual election as required by our Articles of Association. Nominees need to be

Read More »

Chassis Moves to Cannington

The Rover chassis was moved from the manager’s carport in Fremantle, WA, where it had been undergoing inspection and rebuilding. During its time there, the concept and design work on the pressurised body shell was substantially reworked. An important development was a wooden mockup which helped verify design ideas and dimensions with respect to ergonomic fitting of the human driver to the controls, a complex but vital design issue for any vehicle. Once this was built and tested, measurements from the mockup were transferred into the AutoCAD design package we’re using for the plans.

The Rover chassis was moved from the manager’s carport in Fremantle, WA, where it had been undergoing inspection and rebuilding. During its time there, the concept and design work on the pressurised body shell was substantially reworked. An important development was a wooden mockup which helped verify design ideas and dimensions with respect to ergonomic fitting of the human driver to the controls, a complex but vital design issue for any vehicle. Once this was built and tested, measurements from the mockup were transferred into the AutoCAD design package we’re using for the plans. Recently the mockup was dismounted and the chassis was shifted to a contractor’s workshop in Cannington, where assembly of the real bodywork will shortly begin. This is a major landmark in the construction of the rover.

Night work on chassis, showing the cabin mockup

The chassis is delivered to bodybuilder’s workshop

Share: