Powerplant Gets Serviced
Much work on the powerplant – a modified 3 litre, diesel engine with 4 x 4 transmission – took place slowly over the past few months. Many components, especially seals, gaskets, clamps and water pipes etc. of the engine were cleaned, inspected, painted and/or replaced. The oil pan was removed, cleaned and painted. A modified oil dump line was fitted and the speedometer cable was removed. The handbrake was dismantled, inspected for wear, tested and replaced. The speedometer cable was removed – it will be replaced with an electronic version.
