Construction Continues

Construction is proceeding smoothly, with a number of basic components being fitted, including the new forward and rear propeller shafts, the primary fuel tank and shock absorbers. With the steel

Read More »

Steelwork Plans Complete

It’s taken a long time to get further with the project, since both of the main workers have been tied up with other duties (read: paid work). However, at last

Read More »

Powerplant Gets Serviced

Much work on the powerplant – a modified 3 litre, diesel engine with 4 x 4 transmission – took place slowly over the past few months. Many components, especially seals,

Read More »

Chassis Modifcation Proceeds

Work continues on the chassis modification, which is being strengthened as well as elongated. Before the 3L engine and gearbox is mounted to the chassis, the opportunity to recondition it

Read More »

Rover Model Prepared

With clearance from the licensing authorities, work on chassis modification is now under way. Detailed design work in the AutoCad model is now being turned into detailed manufacturing drawings, and

Read More »

Detailed Design Work Continues

More detailed design work has been done towards vehicle certifications and manufacturing plans. Most of this work is done by project Engineer, Bruce Armstrong. We hope that by having everything

Read More »